As we know that the most numerous devices
installed on the corporate network infrastructure, among this numerous device
switch are one of them. www 192.168 o 1.1 admin It
is also very fun and challenging to configure them. It is also very important
to know how switch normally boots and load an operating system. Get the information regarding the wireless setting for the netgear wn2000rpt wifi extender.
Switch
Boot Sequence (2.1.1.1)
1- At First, the switch loads a
power-on-self-test program stored in ROM. After that, you have to POST checks
the CPU subsystem.
2- Then the switch loads the boot loader
software.
3- The boot loader performs low-level CPU
initialization.
4- With the help of bootloader initializes
you will be able to flash file system on the system board.
5- At last the bootloader locates and then
automatically loads a default IOS operating system software image into memory
after that the hand's control of the switch over to the IOS.
Recovering
from a System Crash (2.1.1.2)
1- At first you have to Connect a console
cable from the PC to the switch console port.
2- Then remove the Switch Power Cord.
3- Then you have to reconnect the power
cord to the switch. And then press the switch for 15 seconds and then hold down
the Mode button while the System LED is still flashing green.
4- If the flash is not blinking in green
color then continuously press the switch.
5- The prompt appears in the terminal
emulation software on the PC.
With the help of Boot Loader, you will be
able to format the flash file system, reinstall the operating system software,
and recover from a lost or forgotten password. There are several status LED
indicator lights in Cisco Catalyst switches. A different model of switches has
a different set of LED light.
No comments:
Post a Comment